The Town of Dundee website is undergoing modifications to provide enhanced access to documents for disabled individuals who are visually impaired and to comply with the requirements of the Americans with Disabilities Act (ADA) to make reasonable accommodations. While these modifications are being made many documents have been removed. If you would like to obtain a document not currently provided on the website, please contact our Town Clerk, Lita O’Neill at (863) 438-8330 Ext. 258 or loneill@townofdundee.com. Thank you for your patience and understanding as we implement these changes.

NOTICE OF ROAD RESURFACING IMPROVEMENTS

September 14, 2021

NOTICE OF CONSTRUCTION

2021 NOTICE OF ROAD RESURFACING IMPROVEMENTS

The Town contractor is scheduled for improvements in your neighborhood, please see the schedule below to determine the dates/times your area will be impacted.

Please follow the following guidelines in your area on the dates/times stated below:

  • There will be no parking on the street from 7:00am – 5:00pm.
  • Driveway access will be maintained throughout construction, though there may be periods of time when a side street or driveway is temporarily blocked by construction operations.
  • There will be lane closures, and we encourage alternate routes. Traffic will be limited to local traffic only.
  • Please turn sprinkler systems off on designated dates/times of construction.

Please remember this schedule is subject to change at any time due to unforeseen circumstances. While it is our intention to complete this work on the days and times indicated, weather or equipment problems may cause the work to be delayed, in which case the work may extend later than anticipated or may be completed the following day or as soon as possible thereafter.

We apologize in advance for any inconvenience that you may experience during this process and hope you will enjoy these improvements to your neighborhood once they have been completed.

7th Street:

09/24/2021 Milling

09/27/2021 Paving

10/01/2021 Striping/Concrete Curb/ADA Ramps

Allen Street:

09/24/2021 Milling

09/27/2021 Paving

10/01/2021 Striping/Concrete Curb/ADA Ramps

Shepard Street- from 4th Street to 6th Street:

09/27/2021 Milling

09/28/2021 Paving

10/01/2021 Striping/Concrete Curb/ADA Ramps

3rd Street:

09/27/2021 Milling

09/28/2021 Paving

10/01/2021 Striping/Concrete Curb/ADA Ramps

 

Center Street- from Main Street to Lake Menzie Dock:

09/27/2021 Milling

09/28/2021 Paving

10/01/2021 Striping/Concrete Curb/ADA Ramps

Polk Avenue- from Center Street to 3rd Street:

09/28/2021 Milling

09/29/2021 Paving

10/01/2021 Striping/Concrete Curb/ADA Ramps

Lemon Street- from US 27 to Laura Street:

09/28/2021 Milling

09/30/2021 Paving

10/01/2021 Striping/Concrete Curb/ADA Ramps